|
Crimtech’s new Fabrication Shop was 10 years in the making before it opened in November 2006. From the Fabrication Manager, to the Foreman to the Tradesman, everyone contributed to the design. The result was a “once through line” concept utilizing a common 415 foot long main crane rail.
|